Skip to main content
Projects in Progress

Projects in Progress

PROJECTS IN PROGRESS FOR Al-FAO GENERAL ENGINEERING COMPANY  

NO. Project Name Governorate  Cost (I.D)
1 Construction Of Low Cost Houses / First Stage Babil 29.170.958.000
2 Execution Of AL-Khalis Housing Complex Diyala 49.571.801.928
3 Reconstruction Of Boarding Houses Sacred Karbala 8.007.156.200
4 Execution of the remaining works of the Jdeidet Al-Shatt water project Diyala 54.905.085.900
5 Establishment Of A Multi-Storey Building Of Five Floors In The Oil Complex Dhi-Qar 24.540.241.200
6 Rehabilitation Of The Entrance To The Abu Ghraib Stores With Buildings And Fences Baghdad  8.627.410.000
7 The Housing Complex In Zubaydah Wasit 101.435.400.000
8 Housing Complex Appendix / Al Jazeera (2) Sacred Karbala 78.749.037.317
9 Construction Of The Housing Complex Appendix Diwaniyah 32.345.385.000
10 Low-Cost Role In Al-Numaniyah (Contract Appendix 148) Wasit 35.000.000.000
11 Low-Cost Role In Kut (Contract Appendix 147) Wasit 65.000.000.000
12 The Housing Complex In Al-Azizia Wasit 74.621.946.333
13 Establishment Of The Cultural Center In Kadhimiya (Contract Appendix 13 In 2014) Baghdad  3.258.033.606
14 Establishment Of The Cultural Center (Contract Appendix 14 In 2014) Muthanna 2.770.677.050
15 Prefabricated Building Schools Instead Of Falling Apart ( Kirkuk , Nineveh ) Nineveh 24.850.568.164
16 Implementation, Equipment, Operation And maintenance Of The Eastern Hasiba Water Project Anbar 88.491.937.000
17 Complementary Works To Establish The National Network For Human Rights Office Anbar 1.937.702.640
18 Establishment Of The Human Resources Management Department Building Salah AL-Din 3.164.040.000
19 Developing The Approaches To The Dallah Bridge Salah AL-Din 5.576.680.000
20 Rehabilitation Of Al-Furat General Hospital Baghdad  1.126.544.100
21 Rehabilitation And Furnishing Of The Ashurbanipal Library And The Institute Of Cuneiform Studies (Contract Annex) Nineveh 34.392.911.000
22 Rehabilitating (150) Apartments In The Oil District Salah AL-Din 5.443.990.000
23 Updating And Designing The Water Exchange System At The Salah Al-Din Refinery (2) Salah AL-Din 14.478.000.000
24 Establishing A Health Center In Abu Shatib Area Maysan 1.797.345.000
25 Establishing A Health Center In The Al Majbas Area Maysan 1.809.045.000
26 Rehabilitation And Development Of Al-Dhaght Street (Al-Kufa, Umm Al-Kubr And Al-Ghazlan Neighborhoods Section) Baghdad  5.592.950.000
27 Rehabilitation And Development Of Alley (3), Entrance To Block (348) In Al-Basatin Neighborhood Baghdad  3.774.800.000
28 Rehabilitation And Development Of Aden Street (Stage II) Baghdad  6.379.570.000
29 Rehabilitation And Development Of Fahmi Al-Mudarris Street From Al-Mashateel To Sabah Al-Khayat Square (Stage II) Baghdad  5.889.520.000
30 Preparation, Implementation, Operation And Maintenance Of Complementary Works For The Balad Water Project Salah AL-Din 62.973.386.000
31 Establishing A Hospital In The Nile District Babil 29.200.481.700
32 Remaining Works For The Ministry Of Planning Building Complex Baghdad  7.517.959.601
33 Rehabilitation Of Al-Dagh Street, Neighborhood (343) / Al-Ghurair (Seven Palaces) Area, Within Al-Shaab Municipality Baghdad  1.406.001.000
34 Development of Imam Al-Sadiq Street, Neighborhood (766) / Al-Ubaidi area Baghdad  673.748.000
35 Development Of The Beit Al-Mulla Complex Opposite The Police Station, Within Al-Dora Municipality Baghdad  2.442.018.000
36 Paving The Main Street Of The Tigris Agricultural District And Constructing Sidewalks For The Areas Of (Special Division, Tigris District, And Al-Hawasha) Baghdad  5.038.820.000
37 Rehabilitation of roads and internal courtyards in the Kirkuk Modern Warehouse Kirkuk 4.752.641.000
38 Construction Of Buildings, Departments, And Workshops In Haditha Refinery Anbar 9.191.991.000
39 Construction Of The Building For The Undersecretary Of The Ministry For Refining Affairs At The Headquarters Of The North Refineries Company Salah AL-Din 3.071.545.000
40 Construction Of Sewage Systems In Al-Nidaa Neighborhood Holy Najaf 160.954.310.880
41 Concrete Bases For Raw Gas Meters In The North And South Rumaila Fields Basra 1.233.107.260
42 Construction Of A Second Floor For The Maysan Center For Cardiac Surgery (Private And Consultative Wing) Maysan 1.190.540.000
43 Renovation And Rehabilitation Of Al-Wathba School Maysan 845.317.000
44 Renovation And Rehabilitation Of Al-A'raf School Maysan 360.440.000
45 Equipment And Installation Of A Wastewater Treatment Plant In The Annex Buildings Of Al-Sadr Teaching Hospital Maysan 397.800.000
46 Construction And Paving Of Roads In The (Sayyid Sa'dun) Area Of ​​Kumait District Maysan 1.584.000.000
47 Concrete Crossings At The Basra Refinery Basra 870.000.000
48 Works To Encase The Pipeline Network From The Grease Refinery's Pumping And Storage Cutoff To The Limits Of The Grease Refinery's Operating Units Salah AL-Din 5.924.795.000
49 Civil Defense Requirements In The Iraqi Reform Department Baghdad  7.300.482.051
50 Construction Of Roads And Paving For The Existing And New Product Storage Tanks At The Haditha Refinery Anbar 7.519.800.000
51 Construction Of The Pipeline And Utility Network For The New Storage Tanks At The Haditha Refinery Anbar 8.067.309.000
52 Construction Of Concrete Plugs For Heavy Oil Tanks With Access For Firefighting And Maintenance Vehicles Salah AL-Din 12.094.300.000
53 Construction Of (4) Warehouses With A Shift Building For The Warehouse Department Salah AL-Din 14.547.575.000
54 Rehabilitation Of Baghdad Model College School For Boys In Zayouna Baghdad  100.618.000
55 Constructing Product Pipelines At The Pumping And Storage Station To Minimize Sagging And Ensure Operational Flexibility Salah AL-Din 10.210.000.000
56 Constructing A Comprehensive Training Field For The Occupational Safety And Health Department Salah AL-Din 14.755.024.000
57 Putting Reinforced Concrete Pathways Within The Earthworks For Fire Trucks Salah AL-Din 11.918.440.000
58 Establishing A Gas Storage Facility In The Chemical Storage Section Salah AL-Din 11.309.330.000
59 Rehabilitation Of The Streets Of The Agricultural District (647) Of Shaker Al-Ani - Al-Adel Neighborhood Baghdad  1.150.915.000

 

Hot Posts

FIELD VISITS

Curriculum Vitae For The Company's Top Executives