Projects in Progress
PROJECTS IN PROGRESS FOR Al-FAO GENERAL ENGINEERING COMPANY
Brief description of the project: design and implementation of civil and electromechanical works, installation of equipment and piping, operation and maintenance for the project and a capacity of (3000) cubic meters / hour
Governorate : Al-Anbar
The total cost of the project: (44.638.945.305) Iraqi dinars
Beneficiary: Ministry of Construction and Housing and Municipalities and Public Works / General Directorate of Water
Brief description of the project: demolishing the old building of Zammar High School and rebuilding it on two floors of (12) rows with an area of (1000) square meters with Squares and green spaces with the construction of laboratories and stores, as well as the rehabilitation of the Abu Khashab School with an area (300) square meters and the construction of an additional suite consisting of (6) rows on the second floor
Governorate: Nineveh
The total cost of the project: (739,203.600) Iraqi dinars
تعلن شركة الفاو الهندسية العامة أحد تشكيلات وزارة الأعمار والإسكان والبلديات والأشغال العامة عن إعلان المناقصة المرقمة (6 / 2022) والخاصة بتجهيز مواد السيطرة الاوتوماتيكية الاستيرادية لمشروع ماء ال
تعلن شركة الفاو الهندسية العامة أحد تشكيلات وزارة الأعمار والإسكان والبلديات والأشغال العامة عن إعلان المناقصة المرقمة (4 / 2022) للمرة الثانية والخاصة بتجهيز ونصب وربط وفحص وتشغيل مصاعد كهربائية ل
تعلن شركة الفاو الهندسية العامة أحد تشكيلات وزارة الأعمار والإسكان والبلديات والأشغال العامة عن إعلان المناقصة المرقمة (3 / 2022) للمرة الثانية والخاصة بتجهيز وتنفيذ اعمال الالمنيوم المعدنية لمشروع
FIELD VISTS FOR MR.GENERAL MANAGER
FIELD VISITS TO THE DIRECTOR GENERAL,THE DEPUTY DIRECTOR GENERAL AND THE ADVANCED STAFF
Brief description of the project: demolishing the old building of Zammar High School and rebuilding it on two floors of (12) rows with an area of (1000) square meters with Squares and green spaces