Projects in Progress

Projects in Progress

 PROJECTS IN PROGRESS FOR Al-FAO GENERAL ENGINEERING COMPANY

NO. Project Name Governorate  Cost (I.D)
1 The Installation Of AL-Sheah - Wakf-Directorate Sacred Karbala 6.667.754.500
2 Design, Execution Of Civil And Electromechanically Work For AL-Dujel Water Project Salah AL-Din 52.766.446.160
3 Construction Of Low Cost Houses / First Stage Babil 30.963.875.245
4 Construction Of Low Cost Houses / Second Stage Babil 22.203.768.000
5 Execution Of AL-Khalis Housing Complex Diyala 50.407.434.974
6 Reconstruction Of Boarding Houses Sacred Karbala 7.279.007.000
7 Completing Of Remaining Work In AL-Shatrah Housing Complex Dhi-Qar 41.985.706.202
8 Supplementary works for the project of the Chaldean Patriarchate of Babylon building Baghdad  10.424.279.510
9 Execution of the remaining works of the Jdeidet Al-Shatt water project Diyala 57.179.290.000
10 Construction Of The Al-Khidr Bridge / Secand Stage AL-Muthanna 4.032.950.000
11 Rehabilitation Of The Cooling Towers For The Oil Corporation In The Dora Refinery Baghdad  2.792.315.000
12 Rehabilitation Of Main And Service Streets And Gardens For The role of Employees In The Dora Refinery Baghdad  6.988.280.000
13 Establishment Of A Multi-Storey Building Of Five Floors In The Oil Complex Dhi-Qar 25.609.669.000
14 Rehabilitation Of The Entrance To The Abu Ghraib Stores With Buildings And Fences Baghdad  8.567.848.000
15 Ministry of Planning Buildings Complex Nineveh 9.194.135.390
16 The Housing Complex In Zubaydah Wasit 101.435.400.000
17 Housing Complex Appendix / Al Jazeera (2) Sacred Karbala 78.749.037.317
18 Construction Of The Housing Complex Appendix Al-Diwaniyah 32.345.385.000
19 Low-Cost Role In Al-Numaniyah (Contract Appendix 147) Wasit 35.000.000.000
20 Low-Cost Role In Kut (Contract Appendix 148) Wasit 65.000.000.000
21 The Housing Complex In Kashmara Dhi-Qar 108.275.591.000
22 The Housing Complex In Al-Azizia Wasit 69.670.932.524
23 The Central Agency For Standardization And Quality Control Wasit 13.905.132.615
24 Rehabilitation Of The Central Child Hospital Baghdad  8.489.824.000
25 Establishment Of The Cultural Center In Kadhimiya (Contract Appendix 13 In 2014) Baghdad  3.679.279.186
26 Establishment Of The Cultural Center (Contract Appendix 14 In 2014) AL-Muthanna 2.791.082.650
27 Prefabricated Building Schools Instead Of Falling Apart ( Kirkuk , Nineveh ) Nineveh 24.850.568.164
28 Replacing The Cables Of The Housing Complex In The Doura Refinery Baghdad  1.738.000.000
29 Rehabilitation Of The Locality (833, 867, 869) In The Municipality Of Al-Rashid Baghdad  3.420.142.000
30 Rehabilitation Of Locality (410) Al-Tobji In The Municipality Of Al-Kadhimiya Baghdad  1.102.913.000
31 Constructing A Concrete Wall (T-WALL) With A Bellows Wire On The Iraqi-Syrian Border Nineveh 15.140.000.000
32 Establishing An Emergency Tank In The Chinese Refinery Salah AL-Din 3.069.000.000
33 Establishment Of A Naffeta Tank In The Pumping And Storage Section Of The Salah Al-Din Refinery Salah AL-Din 3.139.042.000
34 Developing The Street From Al-Qadisiyah Intersection To Al-Rashid Intersection In The City Of Samarra Salah AL-Din 4.285.900.000
35 Rehabilitation Of Jurf Al-Nasr And Al-Diwaniyah Schools, With The Rehabilitation Of (24) Water Circulations Al-Diwaniyah 2.786.496.000
36 Rehabilitation Of Schools (9) Maysan 1.800.000.000
37 Rehabilitation Of Qalat Saleh General Hospital Maysan 2.182.825.000
38 Rehabilitation Of Locality (964), Al-Shumukh Area In The Karrada Municipality Baghdad  646.980.001
39 Reconstruction And Rehabilitation Of The Mirbad Government Gas Station AL-Basra 4.125.304.000
40 Establishment Of A Multi-Purpose Sports Hall In The Oil District / Bayji Salah AL-Din 1.094.467.500
41 Establishment Of Prefabricated Construction Schools (38) Babil 55.123.000.000
42 Rehabilitation Of (5) Schools In Hor Rajab And Al-Buaitha Baghdad  495.070.500
43 Urban Statistics Section Building Nineveh 818.266.000
44 Preparing And Installing Doors And Windows For Residential Buildings In The Oil District Salah AL-Din 3.890.200.000
45 Removing Iron Debris (Scrap) In The Oil District Salah AL-Din 406.890.000
46 Implementation Of Asphalt Roads In The Reservoirs Area Of ​​The Pumping And Storage Division In Salah Al-Din Refinery (2) Salah AL-Din 4.198.986.000
47 Paving And Road Planning Works Wor The North Refinery, Production Units And The North Energy Site Salah AL-Din 5.982.075.000
48 Establishing Al-Ahrar School (18) Classes In Al-Ahrar District AL-Basra 1.440.090.000
49 Alternative Station For The Unified Water Storage And Transmission Lines Of Al-Dujayl Salah AL-Din 13.100.705.000

 