Eng. Ammar Abdulrazzaq Issa: our company have accomplished install and erect al-dora silo project in Baghdad

Al fao general engineering company one of the companies of ministry of housing and construction have accomplished install and erect al-dora silo project in Baghdad, Eng. Ammar Abdulrazzaq Issa director general of company declare:
In guidance and direct supervision of highness, construction and housing minister Eng. Mohammed Sahib Aldarajy, our engineering and technical staffs accomplish the installation and operation of silo equipment’s for ministry of trade.
The work consists of installing electrical and mechanical equipment’s for Rehabilitation Dora silo. The main parts are:
1 - Reclaiming conveyors, chain conveyors.
2 - Grain flow pipes and receiving hoppers.
3 - Aspiration dust control system and ventilation system.
4 -Hydraulic diverter for filling (100) ton.
5 -Control room, power station to operate silo with two electrical generator of (1000) KVA.
6 - Fire alarm, lighting and ventilation system.
The silo works at capacity of (300 ton/hour), with total cost exceeds (11) billion Iraqi dinars