| 1 |
Construction Of Low Cost Houses / First Stage |
Babil |
29.090.721.000 |
| 2 |
Construction Of Low Cost Houses / Second Stage |
Babil |
17.396.467.430 |
| 3 |
Execution Of AL-Khalis Housing Complex |
Diyala |
51.072.113.509 |
| 4 |
Reconstruction Of Boarding Houses |
Sacred Karbala |
7.279.007.000 |
| 5 |
Execution of the remaining works of the Jdeidet Al-Shatt water project |
Diyala |
52.940.742.400 |
| 6 |
Establishment Of A Multi-Storey Building Of Five Floors In The Oil Complex |
Dhi-Qar |
25.609.669.000 |
| 7 |
Rehabilitation Of The Entrance To The Abu Ghraib Stores With Buildings And Fences |
Baghdad |
8.567.848.000 |
| 8 |
Ministry of Planning Buildings Complex |
Nineveh |
9.022.241.140 |
| 9 |
The Housing Complex In Zubaydah |
Wasit |
101.435.400.000 |
| 10 |
Housing Complex Appendix / Al Jazeera (2) |
Sacred Karbala |
78.749.037.317 |
| 11 |
Construction Of The Housing Complex Appendix |
Diwaniyah |
32.345.385.000 |
| 12 |
Low-Cost Role In Al-Numaniyah (Contract Appendix 148) |
Wasit |
35.000.000.000 |
| 13 |
Low-Cost Role In Kut (Contract Appendix 147) |
Wasit |
65.000.000.000 |
| 14 |
The Housing Complex In Al-Azizia |
Wasit |
69.911.007.524 |
| 15 |
Rehabilitation Of The Central Child Hospital |
Baghdad |
8.489.824.000 |
| 16 |
Establishment Of The Cultural Center In Kadhimiya (Contract Appendix 13 In 2014) |
Baghdad |
3.258.033.606 |
| 17 |
Establishment Of The Cultural Center (Contract Appendix 14 In 2014) |
Muthanna |
2.770.677.050 |
| 18 |
Prefabricated Building Schools Instead Of Falling Apart ( Kirkuk , Nineveh ) |
Nineveh |
24.850.568.164 |
| 19 |
Rehabilitation Of Jurf Al-Nasr And Al-Diwaniyah Schools, With The Rehabilitation Of (24) Water Circulations |
Diwaniyah |
2.786.496.000 |
| 20 |
Rehabilitation Of Qalat Saleh General Hospital |
Maysan |
3.204.482.000 |
| 21 |
Reconstruction And Rehabilitation Of The Mirbad Government Gas Station |
Basra |
4.091.014.000 |
| 22 |
Establishment Of A Multi-Purpose Sports Hall In The Oil District / Bayji |
Salah AL-Din |
1.094.467.500 |
| 23 |
Demolition And Reconstruction Of Al-Aqsa Mosque School In Sabaa Al-Bour |
Baghdad |
2.064.392.900 |
| 24 |
Implementation, Equipment, Operation And maintenance Of The Eastern Hasiba Water Project |
Anbar |
73.817.437.000 |
| 25 |
Construction Of (13) Residential Homes In The Oil District |
Salah AL-Din |
5.982.075.000 |
| 26 |
Rehabilitation Of Abu Ghraib General Hospital |
Baghdad |
2.706.035.000 |
| 27 |
Complementary Works To Establish The National Network For Human Rights Office |
Anbar |
1.937.702.640 |
| 28 |
Construction Of Overhead Stairs Connecting The Tanks Within The Earthen Embankment Leading To Salah Al-Din Refinery |
Salah AL-Din |
8.347.260.000 |
| 29 |
Establishment Of The Human Resources Management Department Building |
Salah AL-Din |
3.164.040.000 |
| 30 |
Establishing The (Dami Water) Line Linking And Transporting Salah Al-Din Energy (1) To Water Transactions (1) And (2) |
Salah AL-Din |
2.909.550.000 |
| 31 |
Developing The Approaches To The Dallah Bridge |
Salah AL-Din |
5.576.680.000 |
| 32 |
Rehabilitation Of Al-Furat General Hospital |
Baghdad |
1.142.000.000 |
| 33 |
Rehabilitation And Furnishing Of The Ashurbanipal Library And The Institute Of Cuneiform Studies (Contract Annex) |
Nineveh |
34.392.911.000 |
| 34 |
Rehabilitation Of The Road Leading From The Central Information Office To The Entrances To The Old Gate And The Jiki Residential Neighborhood |
Salah AL-Din |
4.984.031.250 |
| 35 |
Construction Of Roofs For The Bus Welcome Areas Inside The Refinery And Oil Neighborhoods |
Salah AL-Din |
7.555.864.000 |
| 36 |
Construction Of A Fuel Oil Production Tank At The Salah Al-Din refinery (2) |
Salah AL-Din |
14.795.000.000 |
| 37 |
Supplying, Installing, And Connecting A Hydrogen Storage Cylinder And Piston System At The Salah Dl-Din Refinery (2) |
Salah AL-Din |
10.931.320.000 |
| 38 |
Rehabilitating (150) Apartments In The Oil District |
Salah AL-Din |
5.443.990.000 |
| 39 |
Construction Of A Power Station Building (MCC) For Power Units In Salah Al-Din Refinery (3) |
Salah AL-Din |
7.382.780.000 |
| 40 |
Equipping Electric Motors (MV) At The Grease Refinery |
Salah AL-Din |
11.880.000.000 |
| 41 |
Equipping Lighting Materials For The Grease Refinery's Production Panels |
Salah AL-Din |
10.200.000.000 |
| 42 |
Complete Rehabilitation Of The Rubber Frame Insulating System For The Oil Tanks With Movable Roofs For Crude Oil Tanks |
Salah AL-Din |
14.742.500.000 |
| 43 |
Completion Of The Administrative Wing Section, Fence, And Courtyards, Along With The Road Leading To The (Naft Neighborhood Intermediate School) |
Salah AL-Din |
1.338.927.000 |
| 44 |
Updating And Designing The Water Exchange System At The Salah Al-Din Refinery (2) |
Salah AL-Din |
14.478.000.000 |
| 45 |
Construction Of A Mixing Tank At The Salah Al-Din Refinery(2) |
Salah AL-Din |
14.795.000.000 |
| 46 |
Construction Of A Crude Oil Tank At The North Refinery |
Salah AL-Din |
14.795.000.000 |
| 47 |
Establishing A Health Center In Abu Shatib Area |
Maysan |
1.797.345.000 |
| 48 |
Establishing A Health Center In The Al Majbas Area |
Maysan |
1.809.045.000 |
| 49 |
Rehabilitation And Development Of Al-Dhaght Street (Kufa And Umm Al-Kubr Neighborhoods Section) |
Baghdad |
5.592.950.000 |
| 50 |
Rehabilitation And Development Of Alley (3), Entrance To Block (348) In Al-Basatin Neighborhood |
Baghdad |
3.774.800.000 |
| 51 |
Rehabilitation And Development Of Aden Street (Stage II) |
Baghdad |
6.379.570.000 |
| 52 |
Rehabilitation And Development Of Fahmi Al-Mudarris Street From Al-Mashateel To Sabah Al-Khayat Square (Stage II) |
Baghdad |
5.889.520.000 |
| 53 |
Preparation, Implementation, Operation And Maintenance Of Complementary Works For The Balad Water Project |
Salah AL-Din |
62.973.386.000 |
| 54 |
Establishing A Hospital In The Nile District |
Babil |
29.200.000.000 |
| 55 |
Remaining Works For The Ministry Of Planning Building Complex |
Baghdad |
7.303.882.051 |