Demolition and Reconstruction of Zummar Secondary School And Rehabilitation of Abu-Khshab School In Rabiaa

Brief description of the project: demolishing the old building of Zammar High School and rebuilding it on two floors of (12) rows with an area of (1000) square meters with Squares and green spaces with the construction of laboratories and stores, as well as the rehabilitation of the Abu Khashab School with an area (300) square meters and the construction of an additional suite consisting of (6) rows on the second floor.

 

Governorate: Nineveh

The total cost of the project: (739,203.600) Iraqi dinars

Beneficiary: Reconstruction Fund for Areas Affected by terrorist operations

 

 